Project Details
S&B performed EPC for a 500-MW combined cycle power unit, including the installation of two dual-fueled Siemens Westinghouse 501FD combustion turbines, two Nooter Eriksen supplementary fired heat recovery steam generators (HRSGs) with SCRs and CO catalysts and a Siemens Westinghouse steam turbine.
Power Block 3 was integrated into existing Power Blocks 1 and 2 with consideration for additional future power blocks. This project was completed three weeks ahead of schedule.