Project Details
S&B performed EPC for a 500-MW combined cycle power unit with two GE 7FA dual fuel combustion turbine generators, Nooter Eriksen heat recovery steam Generators with SCRs and CO catalysts and a GE D11 steam turbine. The project was completed two weeks ahead of schedule.